Rougher Village, which includes a basketball fieldhouse in the south endzone with a deck that overlooks the football stadium and a meeting room utilized by both the football and basketball facility, was part of a $110 million bond issue that was passed in 2019. The football stadium was completed at a cost of about $8.4 million and features a video board located on the fieldhouse at the southend of the facility. A traditional scoreboard on the north end of the stadium. There is a two-story press box that features space for home and visitor radio/video streaming broadcast teams, home and visitor coaches boxes, a suite that is utilized by the Superintendent to host guests, and an elevator. The facility has LED lighting and a ticket booth.